Wuhan Rail Transit Line 1 Phase II Project of

Wuhan Urban Rail Transit Line 1 Phase II project has been divided into 2 parts which are East section and West Section. Total length of mainline is 18.25 km. There is one control center for both phase I and phase II projects, and new rolling stock depot and comprehensive maintenance base have been built in Gutian. CHSR has undertaken specialized equipment system integration for rolling stock depot and comprehensive maintenance base. As a general contracting project, work scope of this project covers equipment design (including process design), manufacturing, convey, supply, civil, equipment civil foundation, installation, commissioning, test run, completion and acceptance, and training. Equipment of the project includes process bogie, mobile lifting platform, frame overturning machine, steel structure maintenance platform, spare parts storage cabinet, spare parts & components storage shelf, workbench, air conditioners storage rack, mobile air conditioner maintenance vehicle and protections, traction motor test stand, air spring test stand, air compressor test stand, high speed circuit breaker test device, electrical comprehensive test bed, driver controller test bench, electrical current & voltage sensor test bench, voltage withstand comprehensive test bench as well as metro maintenance and test devices for rolling stock electrical equipment.

Produced By CMS 网站群内容管理系统 publishdate:2021/04/27 10:11:25