Overall Solutions

Nanning Rail Transit Line 1 Phase I Rolling S

The phase I project of Nanning rail transit line 1 sets Shibu as the first station and Nanning east railway as the terminal station. The line is 32.1km long with 25 stations, one rolling stock depot and one parking lot. Tunli rolling stock at Tunli railway station will be built in the east and Xixiangtang parking lot at Shibu station in the west. Tunli rolling stock depot is responsible for entire line rolling stock maintenance, periodic maintenance and the parking, operation, running preparation, parking maintenance, monthly maintenance etc. It sets entire line comprehensive maintenance center, training center and police station while Xixiangtang berth yard is mainly responsible for the assigned rolling stock parking, operation, running preparation, parking maintenance, monthly maintenance, etc. CHSR undertakes the core equipment system solution of Tunli rolling stock berth yard and Xiixnagtang berth yard. The integration work includes wheel set tread dynamic inspection system, rolling stock automatic washing plant, analog driving equipment, machine shop vehicle and etc. It involves all 18 sets large equipment with different types.

Produced By CMS 网站群内容管理系统 publishdate:2021/04/27 10:11:24